Avent Ferry Road Realignment (Downtown)

Avent Ferry Road RealignmentTransportation Bond Project

Realigning Avent Ferry Road on the downtown side of N.C. 55 to create a new cross-town connection from Avent Ferry Road to Bass Lake Road via Stinson Avenue. 

The realignment uses Pine Street to connect Avent Ferry Road with Stinson Avenue, reducing downtown congestion and serving as another access to the UNC Rex Holly Springs Hospital.

Location:

Avent Ferry Road, Pine Street

Estimated construction start:

Late 2024

Completed

  • Survey
  • Traffic analysis
  • Preliminary roadway alignment
  • Private utility design

Underway

  • Final designAvent Ferry Road downtown
  • Environmental permits & studies 

Public engagement:

Next steps: 

  • Right-of-way acquisition in 2023

Key partners:

NCDOT, Capital Area Metropolitan Organization, Duke Energy

Contact:

Utilities and Infrastructure Services: (919) 577-3150