Transportation Projects
-
Middle Creek Greenway
Design and construction of a nearly 3-mile off-street greenway, generally following the path of Middle Creek and connecting the neighborhoods of Arbor Creek, Bridgewater, Woodcreek and Sunset Ridge North.
Link to page -
Avent Ferry & Holly Meadow Signal
Installing traffic signals and signalized pedestrian crosswalks at the intersection of Avent Ferry and Holly Meadow roads closest to Cass Holt Road. This project will improve both pedestrian and vehicular safety and flow at one of the entrances to the Holly Glen neighborhood near local elementary, middle and high schools.
Link to page -
Avent Ferry Road Widening
Widening Avent Ferry Road from N.C. 55 to Ralph Stephens Road
Link to page -
Holly Springs Road Widening
Improving Holly Springs Road to a consistent four-lane, median-divided road with sidewalk, curb and gutter, and pedestrian crossings.
Link to page
-
NCDOT Complete 540
Connecting 540 from NC 55 to US 64 / US 264 in Knightdale, completing the 540 Outer Loop around the greater Raleigh area.
Link to page -
Transportation Bond Projects
Projects funded by the $40 million Transportation bond approved by voters in 2018.
Link to page -
Utley Creek Greenway
Connecting west and east Holly Springs, from West Ballentine Street near the Oaks of Avent Acres club house, along an existing greenway, through an existing pedestrian tunnel under NC 55, to the Morgan Park greenway.
Link to page