Environmental Requirements and Information

Timbering: A timbering plan approval or a timbering exemption is required prior to starting any timbering operations in Holly Springs. Learn more here.

Erosion and Sedimentation Control Program: Links to information about erosion and sedimentation control in Holly Springs.

National Pollutant Discharge Elimination System Phase II Stormwater Permit and Program Information: View information about the Town’s National Pollutant Discharge Elimination System Stormwater Program.

NPDES Post-Construction Stormwater Management: Detailed information about requirements for development and redevelopment projects.

Floodplain Management: Information includes the drainage policy for the Town and flood damage prevention ordinance.

Riparian (Stream) Buffers: Information about buffers regulated within Town limits.